Biddesk

Illustrative document · not a landing page

Go / No-Go report · Northline IT Sp. z o.o. Go Conditional

HR systems maintenance · 24 months · PLN 1.8m net

Demonstrative sample. This is the grain of the report that returns within 24 working hours of the specification. Fiction. Sample date: 18 Aug 2026.

Procedure snapshot

BuyerVoivodeship office (fictional data)
Subject-matterHR systems maintenance and development, 24 months
Estimated valuePLN 1.8m net
Submission deadline12 days from publication of the notice
LanguagePolish
Contractor profile42 staff, PLN 7.7m turnover, ISO 27001
Preliminary chancemedium (MED) — conditional on closing the reference gap

Selection criteria

Mandatory participation conditions / kill criteria.

#Specification requirementStatusEvidence check
1Average annual turnover min. PLN 4.0mPASSmet2025 financial statements — turnover PLN 7.7m
2ISO 27001 valid on the lodgement datePASSmetcertificate valid to Mar 2027
3At least one completed maintenance contract min. PLN 650,000 net (no aggregation of smaller contracts)FAILnot methighest documented reference: PLN 600,000 net (gap: PLN 50,000)
4Professional indemnity min. PLN 2.0mPASSmetvalid policy — sum insured meets the threshold

Critical formal gap. The contractor’s reference is PLN 600,000 net. The specification (in this sample: chapter V point 2.3) requires a single contract of at least PLN 650,000 net and expressly forbids aggregation. Clarifications (PZP art. 284) will not lower that threshold — the buyer would have to amend the specification.

Paths to a call within 48 hours:

  1. Request to amend the specification (ask to lower the threshold to PLN 600,000).
  2. Bid in a consortium, or rely on a third party’s capacity (PZP art. 118).
  3. Failing that — the call drops to No-Go.

Contract risks

1% of contract value per day of SLA downtime — RISK. That is not a selection criterion; it sits in the draft contract terms. Ask the buyer for a market-typical rate (0.1–0.2%) or an aggregate cap (e.g. 20% of contract value).

No ban on subcontracting key parts of the contract. Assignment-of-receivables clauses are standard; assignment is not the same as subcontracting.

The call, in plain language

Bid only if, within three working days, you close the reference threshold: either a positive amendment after the request, or a signed arrangement with a partner for third-party capacity / a consortium. Turnover, insurance and ISO 27001 pass. We will not invent the missing fifty thousand.

Recommended pack: Pack M, from €4,900 net. Eight working days from the moment the reference gap is no longer red.

This report is Biddesk’s operational opinion, not legal advice. The contractor decides whether to lodge. We do not guarantee an award.